Skip to content

Polonia Stadium in Nysa

We carried out a project of roofing the stands at the Polonia Stadium in Nysa, which is a year-round membrane roof.

Year: 2024
Location: Nysa
Area: 1647 m2
Material: Verseidag TXA-1100F
Structure: Abastran Sp. z o.o.
General contractor: DABRO-BAU Firma Handlowo – Usługowa Paweł Dąbrowski
Scope: Design, construction works, delivery and assembly of a membrane roof together with a steel structure of the stand and the club building together with the stand. 

We carried out the project of roofing the stands at the Polonia stadium in Nysa, which is a year-round membrane roof.

The facility was designed using traditional technology with prefabricated elements.
Reinforced concrete elements poured on the construction site, prefabricated steel elements made off-site, assembled on the construction site.
Transverse structural system, stiffening in the longitudinal direction is provided by footings, column fixing, and longitudinal bracing of the covering.
The building is set on poured reinforced concrete footings.

Covering with a single-pitch roof, based on a steel structure. Covering elements placed on steel purlins.

FAQ

  • 1. What material was used to make the roof?

    The roof was constructed using Verseidag TXA-1100F material, known for its resistance to UV radiation and weather conditions.

  • 2. What are the main design features of a roof?

    The grandstand roof was designed as a steel structure consisting of closed rectangular profiles.

  • 3. What are the dimensions of the roof?

    The roof of the grandstand above the audience has dimensions of 88 m x 8.5 m and a maximum height of 4.5 m. The roof of the grandstand above the commentator has dimensions of 60 m x 12.5 m and a maximum height of the structure is 9.89 m.

  • 4. Is the grandstand roof durable?

    Yes, thanks to the use of high-quality materials, the roof is very durable and resistant to various weather conditions.

Realizations

  • Amphitheater in Bartoszyce

    See more
  • Exotarium in Sosnowiec

    Aviary roofing project in Egzotarium in Sosnowiec made of Serge Ferrari Frontside View 381 shading net
    See more
  • Polonia Stadium in Nysa

    We carried out a project of roofing the stands at the Polonia Stadium in Nysa, which is a year-round membrane roof.
    See more
  • Amphitheater in Latoszyn

    The stage roof is stretched between arched roof girders of circular cross-section, connected by braces. The auditorium roof is stretched between an arched girder made of circular pipe and inclined columns. The whole is connected by truss girders with upper and lower chords of circular cross-section and beam girders.
    See more
  • Amphitheater in Nowe Miasto nad Pilicą

    We completed the design, delivery and assembly of the membrane roof along with the steel structure of the amphitheater roof.
    See more
  • Amphitheater in Ostrowiec Świętokrzyski

    The implementation of this ambitious project included the delivery and assembly of a steel structure with a membrane covering. Although the assembly was a challenge due to the need for precision work, we managed to achieve the goal. The structure, characterized by simplicity, fits perfectly into the modern landscape of the city, while emphasizing its cultural identity.
    See more

    Write to us

    Open: 7:00 AM – 3:00 PM
    Monday to Friday


    Abastran Europe s.r.o.
    Jaroňkova 1160/2, Přívoz
    702 00 Ostrava

     

    Cooperation with: https://abastran.com/

    Contact

    Email : info@weldup.eu

    Phone: +48 32 438 96 50