Amphitheater in Nowe Miasto nad Pilicą
We completed the design, delivery and assembly of the membrane roof along with the steel structure of the amphitheater roof.
Year: 2023
Location: Nadpiliczny Park in Nowe Miasto nad Pilicą
Area: 140 m2
Material: Serge Ferrari Flexlight Advanced 1002
Structure: Abastran Sp. z o.o.
General contractor: GIERMAKOWSKA Roboty Drogowe i Pąkarskie Construction of Tennis Courts
Scope: design, assembly of steel structure, delivery and assembly of membrane
FAQ
-
1. What materials were used to construct the Amphitheater roof?
The roof is made of Serge Ferrari Flexlight Advanced 1002 material, which is durable and efficient for tensile architecture structures.
-
2. What are the main design features of a roof?
The roof structure is in the form of a saddle, made of steel. The maximum dimensions of the roof in plan are approximately 10.75 m x 14.3 m. The maximum height is approximately 5.71 m.
-
3. What is the function of the roof in the Amphitheater?
Zadaszenie chroni przed deszczem, słońcem oraz innymi warunkami atmosferycznymi, umożliwiając organizację różnorodnych wydarzeń kulturalnych niezależnie od pogody.
-
4. Is the roof durable and how is it maintained?
Yes, thanks to the use of high-quality materials, the roof is very durable. Maintenance mainly consists of periodic inspections of the steel structure and cleaning of the PVC membrane to maintain its aesthetic appearance and functionality.
-
5. What were the main design challenges in implementing the Amphitheatre?
The main challenges were integrating the structure into the natural landscape and ensuring that the roof would blend harmoniously with the park and lake surroundings while ensuring functionality and aesthetics.